When to Start and stop testing



1) When to Start Testing

An early start to testing reduces the cost, time to rework and error free software that is delivered to the client. However in Software Development Life Cycle (SDLC) testing can be started from the Requirements Gathering phase and lasts till the deployment of the software. However it also depends on the development model that is being used. For example in Water fall model formal testing is conducted in the Testing phase, but in incremental model, testing is performed at the end of every increment/iteration and at the end the whole application is tested.
Testing is done in different forms at every phase of SDLC like during Requirement gathering phase, the analysis and verification of requirements are also considered testing. Reviewing the design in the design phase with intent to improve the design is also considered as testing. Testing performed by a developer on completion of the code is also categorized as Unit type of testing.



2)  When to Stop Testing


Unlike when to start testing it is difficult to determine when to stop testing, as testing is a never ending process and no one can say that any software is 100% tested. Following are the aspects which should be considered to stop the testing:
· Testing Deadlines.
· Completion of test case execution.
· Completion of Functional and code coverage to a certain point.
· Bug rate falls below a certain level and no high priority bugs are identified.
· Management decision.